Image:
 Author: ophicleide Group: Default Filesize: 228.68 kB Date added: 2026-07-30 Rating: 5 Downloads: 398 Views: 152 Comments: 13 Ratings: 1 Times favored: 0 Made with: Algodoo v2.2.4 Tags:
|
TRACY-1 was built to clean
PIKE-2 was built to replace the receptionists at MEC (they were incompetent.)
Nio (the unrealistically large robot) was built because (removed for reasons (sorry, Xray!))
The magenta dude is there just for scale |
Last edited at 2026/07/30 20:17:10 by ophicleide
Please log in to rate this scene
|