working reactor

Discuss scenes and videos made with Algodoo.

working reactor

Postby lucek » Sun Sep 13, 2009 2:32 am

a few days ago I was inspired to try to make a working reactor in phun. after several dozen changes and 3 totally scraped designs today at 7:47 pm I brought online reactormark 3. a controlled reaction was attained at 7:49 and shut down was initiated at 7:54 shut down was complete at 7:55.
the controls need work but with a steady hand can keep it from going hypercritical and crashing phun.
download
the controls are very simple. on the number pad
4 inserts the control rod.
1 removes the control rod.
5 inserts the fuel rod.
2 removes the fuel rod.
0 initiates SCRAM
in this scene first insert the control rod slightly then the fuel rod. if any slow down happens you are on the way to a crash so scram immediately.
lucek
 
Posts: 3
Joined: Sun Sep 13, 2009 2:06 am

Re: working reactor

Postby KarateBrot » Sun Sep 13, 2009 3:21 am

just upload it on algobox. it's easier to download it from there.
Image
User avatar
KarateBrot
 
Posts: 825
Joined: Mon Aug 31, 2009 7:32 pm
Location: Germany

Re: working reactor

Postby lucek » Sun Sep 13, 2009 3:28 am

KarateBrot wrote:just upload it on algobox. it's easier to download it from there.

I intended to, only I just got a white screen every time I went there.
lucek
 
Posts: 3
Joined: Sun Sep 13, 2009 2:06 am

Re: working reactor

Postby KarateBrot » Sun Sep 13, 2009 3:36 am

try it again tomorrow. they have some problems with algobox at the moment. ;)
Image
User avatar
KarateBrot
 
Posts: 825
Joined: Mon Aug 31, 2009 7:32 pm
Location: Germany

Re: working reactor

Postby lucek » Sun Sep 13, 2009 3:45 am

KarateBrot wrote:try it again tomorrow. they have some problems with algobox at the moment. ;)

I figured as much so I was just planning to try again when I have a practicably model to update with.
lucek
 
Posts: 3
Joined: Sun Sep 13, 2009 2:06 am


Return to Scenes

Who is online

Users browsing this forum: No registered users and 2 guests